NGC Forums

The Dalles Dam

I watched the show on the replacement of the upstream gate at John Day Dam.While that is nothing compaired to what is going to happen at The Dalles Dam.In December 2010 the down stream gates (over 100 feet tall and 350 tons each)are going to be removed and new pintle bearings installed,also they will make a cut 11" wide down the entire length fo the gate and weld on new seals.The locks will be completly unwatered a site to see there are just a handfull of people that have seen the locks without water.you will be able to walk in the giant tunnels that are used to fill and drain the locks and see the tainter valves that control the flow.

Add This:
StumbleUpon
Digg
Delicious
Face Book
Digg
Technorati

1 Reply

  • user-pic
    Jay98602
    October 2, 2009 12:13 PM

    An update
    The gate broke before the 2010 outage shutting down the river traffic,it is out of service now,and getting a quick fix to reopen the river

Add a Reply

Please Login Above to Post Reply

NAT GEO NEWSLETTER

Always Know What's On!